John Zhao (Harry Seidler & Associates) to Paul Galvin (Built), Change to the Batten Install, 22 Sep 2017
ID
P33-F02-S02-0022
Description
Email from John Zhao (Architect, Harry Seidler & Associates) to Paul Galvin (Built) following a discussion with Daniel Berwanger (Studio Anri Sala) onsite, advising a change to the batten install in the lower ceiling, requiring the last batten to have a higher profile, per Zhao's sketch, attached, 22 September 2017.
Date
22 September 2017